New and Changed in OpenUtilities Substation CONNECT Edition Update 9 Refresh 1

The following items summarize the new features and enhancements in the OpenUtilities Substation CONNECT Edition Update 9 Refresh 1 release.

  • Bill Of Material Balloon (Item) Number Reservation. Below BOM Manager function can be used to create spare line items on a Bill of Material report.

    New BOM Manager function called Insert Spare has been add to the right click menu. When this function is executed, the user will be prompted to enter the number of desired spares. After successful execution, new Balloon (Item) Numbers are added sequentially; starting at the active/selected record. Duplicates Balloon (Item) Numbers are not allow. When this condition is encountered, the user will be prompted to change the Number of Spares value.

    Example Scenario: User needs to Reserve 5 Balloon (Item) Numbers starting at Balloon (Item) Number 13.

    User Enters desired number of spares. (Example 5)

    End result. 5 spare Balloon (Item) numbers are added. Note: By default, spare part numbers will appear in Bill of Material reports. Changes to your report template may be required if the autogenerated spare part number values do not need to be displayed in your report. (I.E. _SP1_, _SP2_ , etc.)

  • General Usability Improvements
    • Insert Cable function now supports placement of cables when design file units are millimeters.
    • Insert Substation Objects, Cable Method now supports user specified Angle.
    • Move function for Cable Method now maintains the existing rotation of the object being moved.
    • Stretch function now supports variable objects; such as, Cables or Bus.
    • Automatic cut of repeating parts types now supported.
    • Move command maintains existing Cable/Bus level.